Patented Ce Certificate Christmas Tree Stand for Tall Trees
Negotiable | 1 20FT (MOQ) |
Etman Electric (Changzhou) Co., Ltd.
Jiangsu, China
Last Login Date:
Dec 04, 2023
Business Type:
Manufacturer/Factory
Product Description
Company Info
Basic Info.
Product Description
2. Introduction
4. Application
5. How to use
The first step: Set Xmas tree stands in the START position.
The second step: Hold the tree with trunk pointing down, lift the tree up and press it down into the stand.
It's as simple as that, you can finish within 10 seconds!
Here is the link of the video:
https://etman2017.en.made-in-china.comHow to take the tree out
Hold the tree in a firm grip with both hands, place one foot on stand for support and turn the trunk counterclockwise until it is in a free position. Lift out.
6. Specification
Xmas tree stands specification | |||||||
Standard Size | XL Size | XXL Size | |||||
Color | Main body: Green | Main body: Green | Main body: Green | ||||
Ring & Claw: Grey/Red | Ring & Claw: Grey/Red | Ring & Claw: Grey/Red | |||||
Diameter(cm) | 38 | 44 | 56 | ||||
Diameter(inch) | 14.96 | 17.32 | 22.05 | ||||
Weight(kgs) | 1.2 | 1.5 | 3.8 | ||||
Weight(lb) | 2.65 | 3.31 | 8.38 | ||||
Height(cm) | 16.6 | 17.1 | 28.9 | ||||
Height(Inch) | 6.54 | 6.73 | 11.38 | ||||
Material-USA | Main body-PP new | Main body-PP new | Main body-ABS | ||||
Ring-ABS | Ring-ABS | Ring-ABS | |||||
Claw-Steel with zinc coating | Claw- Steel with zinc coating | Claw-Steel with zinc coating | |||||
---- | ---- | Water Tank-PP | |||||
Material-Euro | Main body-PP | Main body-PP | Main body-ABS | ||||
Ring-ABS | Ring-ABS | Ring-ABS | |||||
Claw-Steel with zinc coating | Claw-Steel with zinc coating | Claw-Steel with zinc coating | |||||
---- | ---- | Water Tank-PP | |||||
Freezing resistant(celsius) (lowest temperature can undertake) | ---- | ---- | |||||
Installation tem | PP+5; PP-new-20 | PP+5; PP-new-20 | -25 | ||||
Storage tem | PP-10; PP-new -35 | PP-10; PP-new -35 | -40 | ||||
Freezing resistant (Fahrenheit) | ---- | ---- | ---- | ||||
Installation tem | PP41; PP-new-4 | PP41; PP-new-4 | -13 | ||||
Storage tem | PP14; PP-new -31 | PP14; PP-new -31 | -40 | ||||
Metal parts(Rust proof) | Claw-Steel with zinc coating | Claw-Steel with zinc coating | Claw-Steel with zinc coating | ||||
Trees up to(m) | 2.3 | 2.8 | 3.5 | ||||
Trees up to(ft) | 7 | 8.5 | 10.6 | ||||
Trunk Diameter(cm) | 11 | 12 | 13 | ||||
Trunk Diameter(Inch) | 4.33 | 4.72 | 5.12 | ||||
Reservoir-liter | 1 | 1 | 4.8-extra reservoir at bottom | ||||
Box Size(cm) | 1/ctn | 12pcs/ctn | 1/ctn | 10pcs/ctn | 12pcs/ctn | 1/ctn | 12pcs/ctn |
39*39*22 | 78*39*60 | 45*45*18 | 94*45*60 | 94*45*72 | 53*53*30 | --- | |
Qty in Container(Floor Loaded) | 1/ctn | 12pcs/ctn | 1/ctn | 10pcs/ctn | 12pcs/ctn | 1/ctn | 12pcs/ctn |
20FT | 890 | 1944 | 804 | 900 | 1080 | 318 | --- |
40FT | 1800 | 3840 | 1675 | 1950 | 2340 | 660 | --- |
40HQ | 2160 | 4320 | 1925 | 2600 | 2340 | 792 | --- |
7. Certificates
8. Production
9. Packing
Professional package design taking full consideration of freight cost and safety.
Freight cost--make full use of the container space
(1) to load more quantity in the container
(2) better protect products from damage because of tilting
Shipping
Usually ship by sea.
10. Trading FAQ
How to order our Xmas tree stands?
1. Interest in any model Xmas tree stands, contact with us
2. Specification confirmation
3. Sample or trail order available for check
4. Once sample approves confirmation, talk detail for package.( Designed or as per normal design )
11. Why choose us?
Advantages we have:
1. Professional manufacturer with more than 20 years' experience
2. High quality and top-end Xmas tree stands
3. Professional R&D dept and sales team support you with good service
Benefit you get:
1. Stable quality Xmas tree stands with high-end.
2. Delivery time: 30-45 working days for mass production.
3. Get 100% refund if quality and delivery time problem happens.
Delivery Terms &Time:
Usually FOB, as per customer requirement, CFR,CIF, EXW, DDU, DDP, Express acceptable.
30-45 working days after deposit, as per product and quantity.
Payment:
TT in advance (new customer), LC, etc.
Port of Loading:
Shanghai
MOQ for Xmas Tree Stands:
Full container